Lock & Dam Project on the Ohio River

Crane & Transport Barges on Olmsted, Illinois Project

Olmsted, IL

A 40′ x 300′ Series S-70 work platform worked alongside a 50′ x 120′ crane barge at the U. S. Army Corps of Engineers Lock & Dam site. Washington Group/Alberici, JV has found numerous applications to make use of the Flexifloat® system, both in and out of the water.

Questions? talk to our application engineers.